Footsteps through the ceiling? A hard floor your board won’t approve?
Florida requires floors between units to reach IIC 50, and many buildings ask for 55 or more. We tell you which underlayment gets you there on a bare slab, how much to buy, and what to hand your condo board. In minutes, without a site visit.
I’m putting in a hard floor
Answer the five questions and your verdict appears here. No sign-up.
Why IIC 70 on the box can mean 55 in your unit
Most advertised ratings are tested with a drop ceiling in the room below. That ceiling adds 10 to 20 points. Most Miami condos have exposed concrete below, so that number doesn’t apply. Our kit only counts tests with no ceiling below.
Footstep noise is stopped on the floor above
From your side you can do little without major work. What works is asking your board to verify that your neighbor’s floor has an approved underlayment, with the right documents. A one-hour consultation ($115) reviews your case and your condo rules.
Book a consultation →Questions
What is IIC?
IIC (Impact Insulation Class) measures how well a floor stops footsteps and dropped objects from reaching the unit below. The Florida Building Code asks for at least IIC 50 between dwelling units; many condo boards ask for 55 or 60.
The box says IIC 70. Why do you say it scores less?
Most headline ratings are measured with a drop ceiling in the room below, which adds 10 to 20 points. In a condo where the concrete is exposed below, the same underlayment usually scores 50 to 57. We only count tests with no ceiling below.
Do you sign the city's affidavit?
No. In the City of Miami the licensed contractor signs the Sound Transmission Affidavit. The kit gives them the products and test reports to list on it.
What if nothing reaches my building's rating?
Then the free check tells you so and we don't sell you a kit. A one-hour consultation ($115) works out the real options: a different floor, a variance request with test reports, or a ceiling below.
Is this a measurement of my apartment?
No. It's built from published laboratory and field test reports that match your floor and slab. Some boards also ask for a field test once the floor is installed.